Remodel Gone Wrong
Hello all, I’m new to this forum.
long story short, the person I hired to do my bathroom was pretty much a disaster waiting to happen. I didn’t want to be stuck in a ticking time bomb so I went ahead and canceled the job, and demo’d the work. $$$$ later, I am stuck. I want to save as much as possible, since it is breaking the bank so I will be doing this remodel myself. I follow instructions very well, respectful, ask questions and I am receptive. Please give me some guidance on what to do. Below is the plan I’d like to execute to have my dream shower.
•Ive left the plumbing, as I did not want to remove in case it wasnt necessary.
•the style i dream of is a modern bathroom.
•I would like a curbless tile shower, with a niche.
•I envision a single glass panel to seperase the toilet.
•The piping has been installed for a rain shower, coming from the wall, instead of the ceiling.
•The existing window will stay.





Should I self level the the concrete before putting up the walls? Or should I put the walls up first then pour self leveler?