top of page
Discussion on tilecoach.com

General Tile Discussion

Public·152 members

Bathroom remodel completed

Thanks to all the assists from your team on this project from a weekend warrior. 8 months of Saturdays finally got this completed. Large tile on the floor was a challenge. You pro's must have developed some great skills.

290 sq ft of Ditra Heated floor with sub panel added to electrical service

322 sq ft of 24" x 24" Porcelanosa floor tile

183 sq ft of 23" x 13" Porcelanosa wall tile

Porcelanosa Krion sinks, tops (fab by Gerali Design, Elgin, IL) and shower base

Walnut Vanity and wall mounted makeup desk (ABA Custom Woodworking, Crystal Lake, IL)

Americh Tub, Kohler fixtures. Amba heated Towel Rack (Studio 41, Palatine, IL)

Before:

ree

ree
ree

After


ree



ree



ree


ree

ree

ree

ree

83 Views
trtpublic
Jan 26, 2025

Thank you

Members

bottom of page