Plumbing done, closer to tiling.
Again, thank you tile coach for plumbing advice. This is my first ever shower valve and there were a lot of sweats to get to the expansion pex. I had to redo one of the vertical PEX adapters but, to my absolute shock, when I pressurized the system - no leaks in the shower valve. Other things that have learned from the tile coach videos - I made sure that the shower valve landed in the center of where I will have a full tile and also the shower heads will all be in the center of full tiles.

44 Views


Figuring out the layout and what will look aesthetically pleasing has been one of the most fun and most frustrating parts of this entire project. Placement of the shower heads, the bench, the niche, the controls. Locating the lights and the fan. I have the ceiling in and the walls furred out and I'm thinking I might run a wire to the niche area and put the LED lighting in there like you did in one of your videos because I'm an electrical engineer and that's kind of my bag. Once this bathroom is down I have three more to go.